Large Hospital

Large hospital with over 1000 Beds. Bar-Tech controls the greater majority of the hospital’s buildings including the Central Energy Plant which includes Eight Chillers, Ice Storage and a Primary/Secondary and Tertiary chilled water system.
Over 20,000 connected IO Points


Large Data Centre

Described as Australia’s Leading Data Centre the 14,000m2 Polaris facility is rated to Tier 3+.
Bar-Tech was engaged as an Integrator to provide a reliable, multi-protocol solution to encapsulate all of the building-related data onto a single platform for the purpose of validation, alarm management, and building management.
Over 14,000 software points are monitored


International Airport

This Internation Airport is one of Australia’s leading regional airports, providing air links to a range of domestic and international locations.
Bar-Tech were appointed to undertake a system upgrade and integrate many of the airport’s systems onto a common management platform including:
– All HVAC Control
– Integrated to the Flight Management system to automated the on-demand operation of the runway lighting, Aerobridge air conditioning, access control and Baggage handling conveyors
– Integrated the monitoring and operation of the lighting and security systems


Another Large Hospital (PAH)

This Hospital has 780 beds. Bar-Tech controls the greater majority of the hospital’s buildings including the Central Energy Plant which includes six Chillers, three Boilers, and three Generators. Every medical storage system is monitored for quality purposes and alarms are generated when necessary. High-level integration is provided to all major plant including the medical gas and vacuum systems.